Manufacturing
Get more output from the plant you already run.
When a bottleneck machine goes down, the cost can show up in missed shipments, scrap, and overtime. Paxton helps plant leaders and IT teams compare wireless, equipment monitoring, and secure vendor support around the production losses they need to reduce.
Keep a bottleneck asset running through the next shift
Example workflow. A recurring motor fault stops the line before orders ship. Ask qualified providers to compare condition monitoring tied to a maintenance work order. If the delay comes from waiting for a specialist, evaluate secure vendor access instead.
What to measure in a pilot
Measure unplanned downtime, false alerts, repair time, and overtime on one line.
What one stalled bottleneck costs your plant
When a constrained machine stops, labor may remain on the clock while output falls, changeovers slip, and overtime rises. NIST identifies reduced machine downtime as a potential benefit of digital manufacturing and highlights predictive maintenance as a way to schedule downtime. NIST manufacturing guidance
Calculate the cost of waiting
Multiply unrecovered production hours by contribution per bottleneck hour. Track incremental scrap, overtime, and expedited freight separately and avoid counting the same lost output twice.
Test whether the technology pays off
For a recurring failure, pilot vibration or temperature monitoring tied to an assigned maintenance action. If waiting for an outside specialist drives downtime, compare secure vendor access. If material stops moving because scans fail, test plant wireless at the bottleneck.
In a 2025 survey of 128 leaders responsible for manufacturing or supply chain decisions, Gartner reported that 49% of organizations lacked confidence in their manufacturing strategy to deliver business outcomes over the next three years. Define a measurable plant outcome before expanding a pilot. Gartner research
What did the last stop cost, and which part of that loss could a pilot actually reduce?
Protect throughput before adding more plant technology
Find the constraint that costs the most
If a scanner disconnects at receiving, material can wait even when machines are running. Map the transaction from scan to inventory update. Compare managed industrial Wi-Fi, targeted private wireless, and wired options against real roaming, interference, and device requirements.
Move maintenance into a planned window
For a recurring failure on a bottleneck asset, evaluate condition monitoring such as vibration or temperature sensing. Start with a known failure mode, connect alerts to a maintenance work order, and give someone ownership of the response. Track avoided unplanned stoppages, false alerts, and time to repair.
Get specialists to the right system faster
Give authorized equipment vendors limited, time-bound access to the assets they support. Compare secure remote access, logging, and vendor handoff with your plant engineers. Keep safety and production requirements central and test changes in an approved maintenance window.
NIST manufacturing technology and predictive maintenance guidance
Which bottleneck costs the most in lost output, scrap, or overtime, and what would one line have to prove before you roll it out?
Where to start
Start with the production step that stops when a connection fails. NIST treats reliability, safety, and performance as distinct OT requirements. Use those requirements to decide what can change during a maintenance window.
NIST Guide to Operational Technology Security
What a pilot should prove
Pilot one cell, aisle, or dock. Record scan failures, recovery time, and how long maintenance waits for support. Run a controlled fallback test with plant staff.
Bring one problem to the review
Which process stops first, what is an hour of downtime worth, and who can approve the test?
Bring one site, workflow, or upcoming decision. We can discuss the business impact, timing, and who needs to be involved, then agree on what is worth evaluating.
Related services
Connectivity & Network Resilience · Secure Access with SASE and SSE
