AI & data center infrastructure
Will your site be ready
when the servers arrive?
Paxton helps compare complete AI server systems across manufacturers and coordinate the networking, storage, rack, power, and cooling requirements that determine when you can put them to work.
Will your AI servers be ready by launch day?
Example workflow. A team has a launch date and needs multiple GPU servers. Compare equivalent configurations and phased delivery across suppliers, then have facilities validate power and cooling before accepting a build slot.
What to measure in a pilot
Track confirmed systems by date and days from delivery to accepted workload.
Sourcing NVIDIA B200 and B300 servers
NVIDIA lists HGX B200 and HGX B300 as shipping platforms. Getting the quantity you need by your deployment date depends on the complete server configuration and what a supplier can commit to. Public supplier listings illustrate the difference: one lists configured B200 and B300 servers with a shipping estimate, while another lists both as source-to-order with timing confirmed per quote. NVIDIA HGX platforms · Compute USA listings · Lineage Tech availability
More manufacturers give you more options
Paxton can compare complete systems from multiple manufacturers and supplier channels. If one supplier cannot commit to the required quantity or date, another may have a suitable configuration in stock, an earlier build slot, or a phased delivery option. We compare those options against your workload, rack, power, cooling, and support requirements. We confirm stock, allocation, and lead times with the supplier for each project.
What to verify before placing an order
- Quantity and allocation. Ask how many complete systems are available, whether they are physically in stock or allocated for a future build, and how long the supplier will hold them.
- Configuration and facility fit. Check the exact bill of materials, networking, rack power, and cooling. Dell, for example, documents both air-cooled and liquid-cooled B300 configurations. Dell B300 system configurations
- Delivery and support. Separate the estimated ship date from site delivery and acceptance. Confirm the warranty provider and who handles replacement parts or service after deployment.
Planning question. How many systems do you need on day one, which specifications are fixed, and would phased delivery keep the project on schedule?
What we review
Start with the workload and the site.
Still evaluating where to deploy the system? Explore Cloud & Colocation.
Complete server systems
Define the workload, performance target, memory, software compatibility, and support requirements. Compare suitable configurations, including NVIDIA B200/B300-based systems where they fit.
Networking & storage
Review switching, interconnects, cabling, capacity, throughput, and data movement against the proposed compute design.
Racks, power & cooling
Identify rack fit, weight, power distribution, cooling, and site requirements. Bring qualified facility and implementation providers into the review to validate them.
Before you commit
Compare suppliers on the same criteria.
A lower hardware quote can come with a different delivery date, warranty, or acceptance process. Compare what each supplier will deliver and which dependencies someone else must own.
Paxton coordinates requirements, supplier evaluation, and procurement. Qualified providers validate facility requirements and scope engineering and installation.
Configuration, supplier authorization, availability, pricing, and lead times are confirmed for each project.
First conversation
What could keep the project from going live?
Bring the workload, deployment location or site status, and target date if you know them. Those details help us identify what to confirm with suppliers and facility specialists. We’ll discuss the impact of delays, who needs to be involved, and what to verify before requesting quotes.
Scope an infrastructure project ↗A delivery date is only one milestone
A server can arrive before the facility can support it. Put power, cooling, installation, warranty, and workload acceptance on the same schedule.
What does a week of delay cost, and who owns each prerequisite?
Problems to address. GPU quotes that omit networking, power, or cooling; delivery dates that precede site readiness; unclear warranty and acceptance ownership.
How to compare options. Compare time to an accepted, usable system. Put delivery, facility sign-off, installation, and workload acceptance on one schedule.
Gartner estimated that AI-optimized servers would account for 31% of data center power consumption in 2026. Put facility readiness on the procurement timeline. Gartner research
Questions for your team
- What workload must run on day one?
- What rack power and cooling can the site support?
- Who signs off that the system meets the acceptance criteria?