Connectivity & Network Resilience
Two quotes say 1 Gig. Will both keep your business running the same way?
A lower monthly price can leave you with slower uploads, weaker repair commitments, or backup that fails with the primary line. Paxton helps you compare upload speeds, repair terms, backup paths, installation costs, and contract terms against what each site needs to stay online.
Keep card payments running on backup
Example workflow. A store has two connections but both enter through the same conduit. Ask the carriers what path diversity they can verify and test processor-approved payments under backup during a controlled outage.
What to measure in a pilot
Measure time to restore checkout and successful test transactions.

What Paxton helps you review
Could your primary and backup connections fail together because they share a building entrance or upstream path?
Rank the sites
Identify the locations and applications that would cause the greatest disruption if access failed.
Compare the options
Evaluate service availability, installation costs, performance commitments, and how failover would work.
Plan deployment
Track site readiness, installation milestones, acceptance tests, and the person responsible for escalation.
For cellular backup, fleet connectivity, or in-building coverage, explore Enterprise Mobility & Wireless.
What the review can look like
A sample comparison puts primary access, backup access, known shared dependencies, and failover testing side by side for each site.
Start with one issue
Bring the location, critical applications, and renewal or move date. Providers confirm availability, path details, and final design.
Plan my connectivityTwo circuits can share one point of failure
Ask providers to confirm physical path diversity where possible and demonstrate failover with a critical application. Compare time to restore service alongside speed.
Which location loses the most if both circuits go down?
Problems to address. Branches losing access to cloud apps; backup circuits that share a failure point; installation delays when sites open or move.
How to compare options. Ask carriers to confirm physical path diversity where available. Agree on a failover test using a business-critical application, then compare installation dates and escalation ownership.
Gartner reported that 68% of buying teams in its 2026 Tech Buying Behavior Study experienced unhealthy conflict. The finding covers technology buying broadly. Gartner research
Questions for your team
- Which site or workflow loses the most during an outage?
- Have we tested failover under real traffic?
- Can the providers confirm separate entrances or upstream paths?
