Construction
Give field teams the current drawing when they need it.
For contractors and project leaders, a trailer can open before the wired circuit is installed. When crews cannot retrieve the latest drawings or submit field reports, they lose time and may have to redo work.
Get the revised drawing to the crew before work starts
Example workflow. A subcontractor is about to build from a superseded drawing. Combine temporary job-site wireless with controlled document access, revision notifications, and offline handling.
What to measure in a pilot
Measure time from approval to field receipt, crew waiting hours, and rework tied to old revisions.
What a late approval or outdated drawing costs the job
Crews may wait for an answer or build against an outdated revision. FHWA documented a Michigan DOT e-Construction example in which average processing time for complex change orders went from 30 days to three. Use the example to identify where your own approval process stalls. FHWA e-Construction implementation plan
Calculate the cost of waiting
Log the crew hours lost to waiting, rework labor and material, and actual schedule or rental costs. Tie each entry to the missing approval or drawing revision.
Test whether the technology pays off
Turn up temporary wireless before mobilization. Test whether crews can access the current drawing, submit photos or inspection evidence, and see an approved change from the work area. Confirm offline access and who releases the current version.
Gartner reported that 68% of buying teams in its 2026 Tech Buying Behavior Study experienced unhealthy conflict. This is cross-industry research. Agree on the cost baseline, decision owner, and pilot criteria before comparing quotes. Gartner research
Which delayed approval or outdated drawing caused the most recent rework, and what did it cost?
Get field decisions back to crews before work has to be redone
Connect a job site when crews mobilize
Compare temporary fixed wireless, managed site Wi-Fi, and wired service against installation timing, active work zones, and how long the site will operate.
Control the version crews can work from
Test how a revised drawing, inspection, or change request reaches the trailer and the field. Evaluate mobile document access, offline handling, and how the system identifies the current revision.
Give subcontractors access to the project they work on
Compare role-based access and offboarding. Verify that approvals, evidence, and submissions reach the right project record without adding duplicate office work.
FHWA e-Construction How-To Guide
Where did a late decision or outdated drawing last create rework, and who owns getting that information to the crew?
Where to start
Treat site connectivity as a mobilization requirement. The FHWA e-Construction guide documents a shift toward electronic project administration. Test how a field worker receives a revision and sends an inspection from the actual work area.
FHWA e-Construction How-To Guide
What a pilot should prove
Pilot one project. Record days to turn up service, time to retrieve current drawings, and how long inspection submissions wait. Plan how to redeploy or retire the equipment when the job ends.
Bring one problem to the review
Which work gets delayed when the site loses connectivity, and who owns getting the trailer online before mobilization?
Bring one site, workflow, or upcoming decision. We can discuss the business impact, timing, and who needs to be involved, then agree on what is worth evaluating.
Related services
Enterprise Mobility & Wireless · Secure Access with SASE and SSE
